UNIVERSITY-OXFORD AIRPORT EAST RAMP ADDITION

Xcavators, Inc. was awarded this $5.1M project as the Prime Contractor in October 2015 to consturct a ramp along the taxiway for future development. The major items of this poject consist of 160,000 CY of On-Site Borrow; 142,000 cy of Off-Site Borrow; 10,500 SY of Lean Concrete Base; 10,300 SY of PCC Pavement; 904 LF of 42″ Concrete Pipe. The project is scheduled for completion in Augst 2016.